911亚洲精品不卡,免费人成黄页在线观看国产,中文字幕精品一区二区三区电影,欧美亚洲日韩二区中文字幕的

  • <p id="yadnf"><ins id="yadnf"><label id="yadnf"></label></ins></p><td id="yadnf"></td>

    <source id="yadnf"><ins id="yadnf"></ins></source>

      Hydrolyzed pan waste steam dealing process


      Summary

      The discharge pressure of hydrolyzed is 0.2MPa, the Moisture in furfural scraps is steamed instantly, the process collect waste steam by draught fan and then condensate ,wash and recycle part of furfural in waste steam, and eliminate waste residue flash steam when discharging to improve the production environment.

      Second, the process flow chart:blob.png

      Service hotline: 0538-3399066;0538-3393566;0538-3393266

      Fax: 0538-3399066

      Zip code: 271600

      Address: Feicheng High-tech Industrial Development Zone, Shandong Province




      2022 Shandong Jinta Machinery Group Co., Ltd. All rights reserved. 




      技術(shù)支持:掘金科技

      WeChat

      WeChat

      WeChat

      WeChat

      Wechat

      Wechat